ARF- 6772 Regular Agenda Item     3. B.    
Special BOS Meeting
Meeting Date: 07/13/2021  
Submitted For: Steve Sanders Submitted By: Betty Hurst, Contracts Administrator
Department: Public Works  
Fiscal Year: 2021 Budgeted?: Yes
Contract Dates
Begin & End:
07-13-21, to 07-12-22 Grant?: No
Matching
Requirement?:
Yes
Fund?: Replacement

Information
Request/Subject
Approval to use State Contract No. ADSPO18-207044 with JE Fuller Hydrology & Geomorphology, Inc. for the Post Telegraph Fire Telegraph Fire-Hydrology and Hydraulic Support for Watersheds.
Background Information
JE Fuller/Hydrology & Geomorphology, Inc. has experience in designing and conceptual mitigation measures for post-fire flooding. The company currently has a cooperative contract with the State of Arizona that Gila County can use.
Evaluation
The scope of work for this contract is outlined in the proposal for four watersheds; Bloody Tanks Wash, Russell Gulch, Upper Pinal Creek, and Silver Creek watersheds.
 
The scope also includes acquiring information for different year event flood models and comparing with FEMA. Debris flow/mudflow considerations and conceptual design for each watershed are a part of the proposal.
Conclusion
To mitigate flooding Gila County needs the information that can be provided through the methods JE Fuller is proposing. The time frame may run into longer than 8 weeks as the scope was developed during the time the fire was still active. The LiDAR may be outdated and the price didn’t include a further expense in that study so another scope may be necessary.
Recommendation
The Public Works Department Director recommends utilizing the State contract with JE Fuller / Hydrology & Geomorphology, Inc. to design modeling for the four watersheds affected by the Telegraph Fire to assist with flood mitigation measures.
Suggested Motion
Information/Discussion/Action to approve the use of State Contract No. ADSPO18-207044 with JE Fuller/Hydrology & Geomorphology, Inc. in the amount of $260,000 to prepare design modeling for four watersheds affected by the Telegraph Fire and assist with flood mitigation measures. (Steve Sanders)

Attachments
Contract Agreement-ADSPO18-207044
JE Fuller Proposal
State Contract Extension
State Contract